
Tógáil bothán
Tíleáil
Cruthaigh botháin fheidhmiúla agus stylish le cabhair ghairmiúil. Ní chuirtear ach saothair san áireamh sa phraghas.
Ceisteanna coitianta faoi FIX
Cá fhad a thógann sé seid a thógáil?
A standard shed is completed in 2 to 5 business days after the preparation and delivery of materials are completed. Larger and more complex structures may require additional time depending on the project.
An bhfuil ceadúnas ag teastáil?
Small sheds often do not require a permit, but the rules depend on local ordinances and the parameters of the structure. During the inspection, we will guide you on what documents are required and assist if needed.
An bhfuil barántas ann?
Yes, we provide a guarantee for installation and the materials used according to their certificates. You receive written conditions and advice for proper operation, which ensure a long life for the shed.
Conas a ordú
- 1.Déan cur síos ar an bhfadhb nó ar an tseirbhís atá uait sa réimse cuardaigh
- 2.Faigh tairiscintí ó ghairmithe fíoraithe i nóiméid
- 3.Roghnaigh an tairiscint agus socraigh am áisiúil
